Wind Power Plants

Eksim Investment Holding has applied to EMRA (Energy Market Regulatory Authority) for 20 wind farm projects with total of 830 MW capacity based on wind measurements that had been made more than 100 locations all around Turkey since 2000.

As of today, 7 applications with 377,5 MW capacity have been approved and licensed by EMRA, currently 235 MW installed capacity is full operational. Eksim is still working to build the size of approximately 1000 MW capacity projects, is going to be one of the leading company in Wind Energy Sector.

The first Wind Power project of Eksim, 60 MW installed capacity, with additional capacity increasing will reach to 72,5 MW installed capacity, Balıkesir - Susurluk WPP has commissioned in February 2011.

Tokat - Killik WPP , 40 MW installed capacity, commissioned within the third quarter of 2011, with additional capacity increasing will reach to 85 MW installed capacity.

Amasya - Kayadüzü WPP , 40 MW installed capacity, commissioned within the third quarter of 2012, with additional capacity increasing will reach to 75 MW installed capacity.

Silivri WPP , 45 MW installed capacity, commissioned within the third quarter of 2014, with additional capacity increasing will reach to 57,5 MW installed capacity.

Hasanbeyli WPP , 50 MW installed capacity, commissioned within the second quarter of 2014

Licensed projects;

Project Name and Location Company Name Installed Capacity (MW) Mechanical Power (MW) Status
Susurluk WPP, Balıkesir Susurluk Energy A.Ş. 72,5 75 Active
Hasanbeyli WPP, Osmaniye Hasanbeyli Energy A.Ş. 50 50 Active
Silivri WPP, İstanbul Silivri Energy A.Ş. 45 60 Active
Killik WPP, Tokat Tokat Energy A.Ş. 85 94 Active
Kayadüzü WPP, Amasya Merzifon Energy A.Ş. 75 82 Active
Seferihisar WPP, İzmir Seferihisar Energy A.Ş. 16 21 Active
Çeşme WPP, İzmir Çeşme Energy A.Ş. 18 20 Licensed

*Capacity increasing applies were made to EMRA.